Demand and forecast
Confirmed orders and forecast form the demand plan instead of a separately maintained planning sheet.
Bills of material, routings, production orders and actual cost in one system, so planning and the shop floor stop working from different numbers.
Business Central Manufacturing and Acumatica.
Platforms we deploy here
The problems we hear most — and what changes once the system holds the process.
Versioned bills of material and routings, with change control, replace the shared spreadsheet.
Machine and work-centre capacity is part of the schedule, not an afterthought.
Material, labour and overhead post against the production order, so actual versus standard cost is visible per run.
Lot and serial tracking traces a batch from raw material to customer.
Output, scrap and rework are captured as part of production reporting.
Configured on standard platform capability wherever possible, extended only where your process genuinely differs.
Versioned structures with change control and where-used visibility.
Output, consumption and time captured where the work happens.
Work-centre load balanced against the production schedule.
Demand, supply and lead time driving what to buy and make.
Forward and backward trace with quality checks at each stage.
Actual versus standard cost by run, reported automatically.
Planning, purchasing and the shop floor working from one schedule and one set of numbers.
Confirmed orders and forecast form the demand plan instead of a separately maintained planning sheet.
MRP nets demand against stock, open purchase orders and work in progress, then proposes what to buy and what to make.
Raw material arrives against the plan, with lot and certificate details captured at goods receipt.
The versioned BOM and routing release to the floor with capacity checked against work-centre load.
Output, consumption, time, scrap and rework are captured where the work happens, not re-keyed later.
In-process and final checks record results against the lot, so a forward or backward trace is answered in minutes.
Material, labour, subcontract and overhead post to the order, giving actual versus standard cost per run.
Finished goods post to stock, are picked against the sales order and despatched with their lot record intact.
The same disciplined path on every manufacturing rollout we deliver.
What teams ask us before starting a manufacturing rollout.
Both. Discrete assembly uses BOMs and routings; process operations use formulas, yields and batch attributes.
Our consultants answer within one business day — no obligation, no sales pressure.
Talk to a consultantContact us today to discuss how our software solutions can help you achieve your business goals and drive digital transformation.